Birmingham, AL
AHU 8S and 9S Replacement
HHB Engineers is the Engineer of Record for the replacement of two of the four Air Handling Units located in the 9th floor penthouse. Project features include:
- Replacement of each air handling unit was completed between 6pm on a Friday and 6am on the following Monday.
- Custom air handling units (Temptrol), dual duct type with Hospital grade air filtration.
- Steam pre-heat and hot deck coils.
- New DDC Controls
Project cost: $650,000