Birmingham, AL
Renovations to 5th Floor
HHB Engineers served as the Engineer of Record for the upgrade and replacement of the 1960’s 2-pipe fan coil system with a chilled water VAV system. Project features included:
- Installation of new ductwork and VAV terminal units
- Installation of new hot water heating piping
- Upgrade existing multi-zone air handling unit to Variable Air Volume (VAV).
- New DDC controls
All work was performed at premium labor periods (after hours and on weekends) to allow continued occupancy during the day.
Project Cost: $325,000