Mobile, AL
Replace Boilers, Mobile Government Plaza
Replace Boilers, Phase 2 Mobile Government Plaza, Mobile, Alabama: HHB was the CxA hired by Mobile County for the replacement of the existing boiler plant for the south wing of the building, consisting of two 2,000 MBH boilers and one 1,500 MBH boiler with primary/secondary piping. As part of the project, HHB Engineers performed energy modeling services for the boiler upgrade project. Through the energy modeling process, HHB analysis discovered excessive natural gas use due to excessive reheat during the summer months. Retro-commissioing of the VAV boxes was recommended.