HHB Engineers were the Mechanical Engineering Consultants for the $110M renovation and expansion of Bryant Denny Stadium completed the fall of 2020. Barbara McCrary, PE served as the Engineer of Record for the project.
Enhancements to Bryant-Denny Stadium included:
HHB Engineers served as Prime AE for a separate but concurrent $2M project to design and install a new chilled water system within Bryant Denny, and also connecting BDS to the campus central thermal chilled water system. This project including removal of 8 air-cooled chilled water systems, modifications to all existing CW systems, three new 100 HP tertiary pumps with bypass and room for a 4th pump. This project was completed in April of 2020.