University of Alabama

Tuscaloosa Alabama
AIME Building Fit-up

HHB Engineers, P.C. has served as the Prime AE since 2002 for all aspects of the interior fit-up of the two story building. This included extension of existing air distribution into lab spaces, bench top and walk-in fume hoods, casework, laboratory gas distribution to casework, electrical distribution to casework, and two sound booths.

Project Cost: close to $2 million since 2002

Special Facilities & Components

  • 12-foot walk-in fume hood.
  • Low face velocity benchtop chemical fume hoods
  • Perchorlic Fume Hoods
  • Modular lab casework system
  • Engine Test Cell facility

HHB Engineers continues to be involved in lab renovations and modifications for the AIME Building as the building adapts for new research.