Tuscaloosa Alabama
AIME Building Fit-up
HHB Engineers, P.C. has served as the Prime AE since 2002 for all aspects of the interior fit-up of the two story building. This included extension of existing air distribution into lab spaces, bench top and walk-in fume hoods, casework, laboratory gas distribution to casework, electrical distribution to casework, and two sound booths.
Project Cost: close to $2 million since 2002
Special Facilities & Components
- 12-foot walk-in fume hood.
- Low face velocity benchtop chemical fume hoods
- Perchorlic Fume Hoods
- Modular lab casework system
- Engine Test Cell facility
HHB Engineers continues to be involved in lab renovations and modifications for the AIME Building as the building adapts for new research.