Birmingham, AL
Install Waterside Economizer, VA Birmingham
HHB Engineers, P.C. was awarded a 3-year Indefinite Delivery Contract with the VA Medical Center in Birmingham, Alabama. One of the projects included the design of a water-side economizer to the main chilled water plant.
Project features included:
- Development of system flow diagram
- Installation of new plate heat exchanger (300-tons)
- New condenser-side pump
- Installation of bypass control valve at cooling tower
- Upgrades to controls
Construction cost: $450,000