HHB Engineers, P.C. was awarded a 3-year Indefinite Delivery Contract with the VA Medical Center in Birmingham, Alabama.  One of the projects included the design of a water-side economizer to the main chilled water plant.

Project features included:

  • Development of system flow diagram
  • Installation of new plate heat exchanger (300-tons)
  • New condenser-side pump
  • Installation of bypass control valve at cooling tower
  • Upgrades to controls

Construction cost: $450,000