Scope: The facility renovation included office space and infrastructure for the US Court Probation office. Spaces included a major server room, attorney offices and support space renovating the entire second floor. The project is designed to facilitate a future total building renovation and upgrade project to follow and will accommodate system expansions. Additional Antiterrorism/Force Protection (AT/FP) issues need to be addressed in the future project to augment what was accomplished in this project and meet current AT/FP criteria. Hattemer, Hornsby & Bailey was responsible for designing new security and duress systems and a total paging system and network. The Telecommunications design included equipment racks, fiber, copper and a total pre-wired package ready for system operation.
Project Cost: $1,400,000.00
Hattemer, Hornsby & Bailey (HHB) served as the Mechanical, Electrical, Plumbing, Design and Fire Protection Engineering consultants including Construction Period Services and was responsible for all aspects of the new Heating, Ventilation, Air Conditioning (HVAC) system electrical systems, fire detection & alarm systems, plumbing and fire protection systems.