Maxwell AFB, AL, Gunter Annex
Repair HVAC, Building 1065 Gunter
HHB Engineers, P.C. were the Mechanical Engineers for the replacement of the existing HVAC system as the main cafeteria building to include VAV boxes, kitchen make-up fans with gas heat, piping system, pumps, and air handling units. Design completed = 2015.