Tuscaloosa, AL
Replace Air Handling Units, Bldg 135, Tuscaloosa VA
Scope: Replacement of 5 air handling units, upgrades to controls (replaced pneumatic with DDC), installation of variable speed drives. In order to allow access, removal of abandoned air cooled chillers and installation of 10’ by 8’ louver. HHB Engineers was the Prime design engineer, and provided construction period services to the Veterans Administration.
Project Cost: $900,000.00