Maxwell AFB, AL, Gunter Annex
Replace HVAC, Building 854 Youth Center, Gunter Annex
Cost Estimate: $548,000
Scope: HVAC Replacement for the 11,500 SF Youth Center at Gunter Annex. Scope includes reusing some of the ductwork, replacement of the AHUs, VAV boxes, chiller, and heating system including some gas furnaces and split DX equipment. The gas fired water heaters were replaced with electric. The new HVAC system consists of a VAV AHU, air cooled chiller, high efficiency natural gas boiler, VAV boxes, and some controls. Challenges included phasing the project such that the building would remain occupied throughout construction
HHB Engineers served as Prime AE for the project.