Maxwell AFB, AL
Tertiary Chilled Water Systems Upgrades
Scope: Replacing 3-way control valves with 2-way valves and adding BTU meters at approximately 30 buildings on the central plant chilled water loop. Each building was surveyed, and the chilled water piping system analyzed for each building. Hydraulic calculations were performed for each building with a tertiary pump.
Cost Estimate: $1.1 million