HHB Engineers has been selected as the Mechanical Engineers for the design of the new Advanced Structural Testing Laboratory Building for Auburn University’s College of Engineering. The building is to be approximately 37,000 SF with a budget of just over $13M. The building will consist of a high bay lab area, concrete materials testing labs, Read More
HHB Selected for Civil Rights Landmark AG Gaston Motel Restoration
HHB Engineers will be the Mechanical Engineers for the renovation and restoration of the Civil Rights landmark, the AG Gaston Motel in Birmingham, AL, working with Lord Aeck Sargent, an architectural and design firm located in Atlanta. The Motel was included in the recent designation of the surrounding areas as the Birmingham Civil Right Read More
Maxwell AFB Central Chiller Plant Design Underway
HHB Engineers is Prime AE for the design of a major upgrade to the central chiller plant at Maxwell Air Force Base outside Montgomery, AL. The project includes replacement of all of the water cooled chillers, currently 6 at 800 tons each, with 6 new chillers approximately 970 tons each. Existing cooling towers will be Read More
McCrary Inducted as Distinguished Fellow
HHB Engineers, PC is proud to announce that Barbara Hattemer McCrary was honored as a newly inducted University of Alabama Distinguished Mechanical Engineering Fellow. The ceremony and reception were held on Wednesday, November 2nd at 5pm at NERC, one of the newly opened engineering buildings on the UA campus. Pictured is McCrary with Interim Department Read More
HVAC Upgrades for Dept of Homeland Security’s COBRATF
HHB Engineers is continuing their long history of work with the Corps of Engineers at the Center for Domestic Preparedness, a Dept of Homeland Security Facility in Anniston, Alabama. In June 1998, the Center for Domestic Preparedness opened its doors as a training center for the nation’s emergency responders. The facility now uses many of the former Read More
HHB Engineers selected for Maxwell AFB Central Plant Upgrade
HHB Engineers has been selected to design a major upgrade to the Central Chilled Water Plant at Maxwell AFB, outside Montgomery, AL. The upgrade to include replacement of 5 of the 6 chillers, currently 800-tons each with greater capacity chillers. Cooling towers to be upgraded and chiller pumps to be replaced. The building was constructed Read More
Renovation of Historic Mississippi River Commission Building
HHB Engineers has been selected, along with TAG Architects, for the HVAC Replacement of the historic 1894 Mississippi River Commission Building in Vicksburg, MS. The General Services Administration (GSA) is managing the project. The building is 59,000 square foot four-story National Register (NR Rating – 3) listed Gothic / Romanesque Revival-style Post Office and Customs Read More
ALFA HQ HVAC Upgrades Complete
Major upgrade to the HVAC systems at the ALFA Headquarters building in Montgomery, AL were recently completed. HHB Engineers served as the Mechanical Engineers for the project during the design and construction phase. Building Area involved in Project: 350,000 square feet Project Construction Cost: $3.4 million Scope of Work: the HQ building was constructed in Read More
LEED Silver Certification – Dannelly Fuel Cell and Corrosion Control Facility
Download PDF HHB Engineers (HHB) announces LEED Silver certification of the 18,500 SF Fuel Cell and Corrosion Control Facility at Dannelly Field for the Alabama Air National Guard. The project was certified using LEED v2.2. Included in the design is a ground source heat pump (geothermal) vertical bore closed loop system, consisting of six 250 Read More
Wesley Sherer, HHB Principal, elected Vice Chair of USGBC AL State Board
Wesley Sherer, PE, CxA, LEED GA, and Principal at HHB Engineers, was elected to serve as the Vice Chair on the USGBC Alabama state chapter Market Leadership Advisory Board (MLAB). The Alabama Chapter recently integrated under the umbrella of the national organization, and the MLAB is the new name for what was formerly the state Read More